Transcontinental Gas Pipe Line Company, LLC v. Permanent Easement Totaling 2.322 Acres

United States District Court, E.D. Virginia, Richmond Division

November 25, 2014

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC, Plaintiff,
v.
Permanent easement totaling 2.322 acres, more or less, and temporary easements totaling 3.209 acres, more or less, over a parcel of land in Brunswick County, Virginia ofapproximately 83.00 acres in size, as more particularly described herein, etal, Defendants.

MEMORANDUM OPINION (GRANTING PLAINTIFFS MOTION FOR SUMMARY JUDGMENT)

HENRY E. HUDSON, District Judge.

This action stems from an expansion effort by Plaintiff Transcontinental Gas Pipe Line Company, LLC ("Transco") to build nearly 100 miles of interstate natural gas pipeline throughout Virginia's Southside region. The case is before the Court on Transco's Motion for Summary Judgment (ECF No. 72). For the reasons stated herein, Transco's Motion will be GRANTED.

BACKGROUND

1. Transco is a natural gas pipeline company subject to regulation by the Federal Energy Regulatory Commission under the Natural Gas Act ("NGA" or "the Act"), codified at 15 U.S.C. §§ 717-717z. On November 21, 2013, the Federal Energy Regulatory Commission ("FERC") issued Transco a Certificate of Public Convenience and Necessity ("FERC Certificate"). See Transcontinental Gas Pipe Line Co. LLC, 145 F.E.R.C. P 61152, 2013 WL 6137661 (Nov. 21, 2013). In accordance with the FERC Certificate, Transco intends to build nearly 100 miles of a new 24-inch interstate natural gas pipeline ("Virginia Southside Expansion Project" or "the Project") in multiple states. (Complaint, ECF No. 1, at ¶¶ 13, 15.) The Project will allow Transco to transport natural gas from a "pooling point" in New Jersey to a new natural gas-fired power station that a Dominion Virginia Power ("DVP") affiliate is building in Brunswick County, Virginia. Transcontinental Gas, 2013 WL 6137661, at *4.

2. By Order entered on September 2, 2014 (the "September 2nd Order, " ECF No. 68), the Court granted Transco's Motion for Partial Summary Judgment (ECF No. 33) and Motion for Preliminary Injunction (ECF No. 35) (the "Preliminary Motions"). The Court's associated Memorandum Opinion (ECF No. 67) included a detailed description of the Project and defendant real property at issue (the "Property"), which is incorporated by reference into this Memorandum Opinion. ( See Mem. Op. at 3-4.)

3. Transco seeks to condemn a permanent easement over and across 2.322 acres of the Defendant real property (the "Permanent Easement"), as well as certain nonexclusive temporary easements over and across 3.209 acres of the same land (the "Temporary Easements"). The Permanent Easement, which will be used for the purposes of laying, constructing, maintaining, replacing, and operating the 24-inch pipeline, is described as "Area of Proposed Right of Way" in the Survey Plat prepared by a Certified Virginia Land Surveyor ("Survey Plat"). (Compl., Ex. C thereto.) A legal description of the Permanent Easement is included with the Survey Plat. A copy of the Survey Plat is attached to this Memorandum Opinion as Exhibit No. 1. The terms and conditions of the Permanent Easement are set forth in Exhibit D to the Complaint, a copy of which is attached to this Memorandum Opinion as Exhibit No. 2. The Temporary Easements, comprised of four temporary construction easements and a temporary access road easement, will be used for work related to the construction of the Project. The Temporary Easements are described on the Survey Plat as "Area of Temporary Work Space No. 1, " "Area of Temporary Work Space No. 2, " "Area of Temporary Work Space No. 3, " "Area of Temporary Work Space No. 4, " and "Area of Proposed Access Road AR-SVLB-89.6." The terms and conditions of the four temporary construction easements are set forth in Exhibit E to the Complaint. The terms and conditions of the temporary access road easement are set forth in Exhibit F to the Complaint. Copies of both of these exhibits are attached to this Memorandum Opinion as Exhibits No. 3 and 4, respectively.

4. In the September 2nd Order and Memorandum Opinion, the Court found that all Defendants were properly served, and only one, Constance Watkins, filed an Answer or Notice of Appearance as required by Fed.R.Civ.P. 71.1(e). (September 2nd Order at ¶¶ 1-2; Mem. Op. at 5.) The Court overruled Ms. Watkins's objections, however, and deemed her unsworn response to Transco's Preliminary Motions improper. (September 2nd Order at ¶ 1; Mem. Op. at 5-6.) Moreover, the Court ruled that Transco has the substantive legal right to condemn the Temporary Easements pursuant to 15 U.S.C. § 717f(h). (September 2nd Order at ¶ 2.) Lastly, the Court found that two owners of the Property, Sylvia Lash Holman and Dora G. James, were no longer entitled to an award of just compensation in this action, as both consented in writing to Transco's acquisition of the easements and received full compensation. ( Id. at ¶ 5.)

5. Pursuant to the September 2nd Order, on September 10, 2014, Transco deposited the sum of $2, 000.00 into the registry of the Court (the "Deposit") as security for the preliminary injunction authorizing Transco to take immediate possession of the Permanent Easement and Temporary Easements. ( See Mem. Supp. Mot. for Summ. J., ECF No. 73, Ex. B. thereto.)

6. Thus after entry of the September 2nd Order, there remained only two considerations for the Court: (1) determine the just compensation owing to the remaining Defendants for Transco's condemnation of the Permanent Easement and Temporary Easements; and (2) vest legal title to these easements in Transco.

7. On September 12, 2014, Transco filed a Motion for Summary Judgment and Roseboro v. Garrison Notice to any Pro Se Defendants who might respond together with a supporting Brief. Transco's Motion requests that the Court enter summary judgment as a matter of law on the remaining two issues in this case. As no Defendant has responded to Transco's Motion, and because the time for any response has expired, this matter is now ripe for disposition.

STANDARD OF REVIEW

8. Summary judgment must be rendered "if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." Fed.R.Civ.P. 56(a). It is the responsibility of the party seeking summary judgment to inform the court of the basis for the motion, and to identify the parts of the record which demonstrate the absence of a genuine issue of material fact. See Celotex Corp. v. Catrett, 477 U.S. 317, 323, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986); Fed.R.Civ.P. 56(c).

9. "[W]here the nonmoving party will bear the burden of proof at trial on a dispositive issue, a summary judgment motion may properly be made in reliance solely on the pleadings, depositions, answers to interrogatories, and admissions on file." Celotex Corp., 477 U.S. at 324 (internal quotation marks omitted). When the motion is properly supported, the nonmoving party must go beyond the pleadings and, by citing affidavits or "depositions, answers to interrogatories, and admissions on file, ' designate specific facts showing that there is a genuine issue for trial.'" Id. (quoting former Fed.R.Civ.P. 56(c) and 56(e) (1986)). "If a party fails... to properly address another party's assertion of fact as required by Rule 56(c), the court may... consider the fact undisputed for purposes of the motion." Fed.R.Civ.P. 56(e)(2).

10. In reviewing a summary judgment motion, the court "must draw all justifiable inferences in favor of the nonmoving party." US. v. Carolina Transformer Co., 978 F.2d 832, 835 (4th Cir. 1992) (citing Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986)). Nevertheless, the nonmoving party cannot create a genuine issue of material fact through mere speculation or the building of one inference upon another.'" Emmett v. Johnson, 532 F.3d 291, 297 (4th Cir. 2008) (quoting Beale v. Hardy, 769 F.2d 213, 214 (4th Cir. 1985)).

ANALYSIS

11. The appropriate measure of compensation in a condemnation proceeding is the fair market value of the property as of the date of the taking. See US. v. Miller, 317 U.S. 369, 374, 63 S.Ct. 276, 87 L.Ed. 336 (1943); see also Columbia Gas Transmission Corp. v. Rodriguez, 551 F.Supp.2d 460, 462 (W.D. Va. 2008) (citing U.S. v. Petty Motor Co., 327 U.S. 372, 377-78 (1946)) (holding that "[m]arket value, ' rather than the value to the condemnor or the owner, is the proper measure of just compensation."). The landowner bears the burden of proving the value of the land taken. U.S. v. 69.1 Acres of Land, 942 F.2d 290, 292 (4th Cir. 1991) (citing U.S. ex rel. TVA v. Powelson, 319 U.S. 266, 274, 63 S.Ct. 1047, 87 L.Ed. 1390 (1943)).

12. Transco is the only party to present any evidence establishing the fair market value of the Permanent Easement and Temporary Easements. Despite abundant time to do so, no Defendant has presented any evidence as to fair market value, nor has any defendant objected to or opposed the evidence provided by Transco. Under Local Civil Rule 7(K)(2) and Fed.R.Civ.P. 56(e), the Court is entitled to, and hereby shall, consider Transco's Motion for Summary Judgment to be unopposed, accept as true and correct the facts asserted in the Motion and supporting brief, declaration, and documentary evidence, and rule on the papers without a hearing. See Custer v. Pan Am. Life Ins. Co., 12 F.3d 410, 416 (4th Cir. 1993) (recognizing that failing to respond to a summary judgment motion entitles the district court to treat the motion as unopposed and the facts stated therein as uncontroverted).

13. After reviewing the record, the Court concludes that there is no genuine issue as to any material fact, and Transco is entitled to summary judgment as a matter of law.

14. In support of its Motion, Transco presents a detailed Appraisal Report prepared by independent Certified Virginia Real Estate Appraisers that determines the fair market value of the Permanent Easement and Temporary Easements is $2000.00. (See Mem. Supp. Mot. for Summ. J., Ex. A. thereto, Valbridge Property Advisors Appraisal Report ("Appraisal Report").) Considering both the breadth and quality of the Appraisal Report, the Court accepts the report's suggestion as to the fair market value of these easements. Particularly significant is the Appraisal Report's consideration of sales of comparable land within a reasonable time before the taking. ( Id. at 1, 18-27.); see U.S. v. 100.01 Acres of Land, 102 F.App'x 295, 298 (4th Cir. 2004) (unpublished) (explaining that the "best evidence" of fair market value is sales of comparable land within a reasonable time before the taking) (quoting U.S. v. Whitehurst, 337 F.2d 765, 775 (4th Cir. 1964).

15. As noted in the September 2nd Order, Ms. Holman and Ms. James received full compensation and were dismissed from the case. (September 2nd Order at ¶ 5.) Additionally, since September 2, 2014, seven other defendants have been dismissed from the case after receiving full compensation.[1] Lastly, Defendants Deborah L. Travis and Celeste Yvonne James were voluntarily dismissed from the case after Transco, upon learning that each is now deceased, settled with their heirs (ECF Nos. 79, 88).

16. Accordingly, only those Defendants who have yet to receive compensation for their interest in the Permanent Easement and Temporary Easements (the "remaining Defendants") are entitled to claim an award of just compensation, and the share awarded must be proportionate to their ownership interests.

17. Transco's evidence indicates that the remaining Defendants have a 38.746% ownership interest in the Property. ( See Pl. Reply Br. Supp. Mot. for Summ. J., ECF No. 96, Ex. A thereto, Second Supplemental Declaration of Timothy Chastain ("Supplemental Chastain Decl."), at ¶¶ 115-7.) Thus, the remaining Defendants are entitled to a just compensation award of $774.92, which reflects their combined 38.746% share of the $2, 000.00 fair market value of the Permanent Easement and Temporary Easements. ( Id. at ¶ 7.)

18. Transco deposited $2, 000.00, the full fair market value of the easements, with the Court. ( See Mem. Supp. Mot. for Summ. J., Ex. B. thereto.) As 61.254% of the ownership interests received full compensation, Transco is entitled to a proportionate refund of $1, 225.08. (Supplemental Chastain Decl. at ¶ 8.)

19. Having satisfied its obligation to pay just compensation for the Permanent Easement and Temporary Easements, the Court hereby finds that Transco should be vested with indefeasible legal title to those easements.

20. An appropriate Order will accompany with Memorandum Opinion.

Exhibit 1

Exhibit 2

PERMANENT EASEMENT TERMS

The Permanent Easement being condemned in this action ("Permanent Easement") shall consist of a permanent easement giving the Plaintiff, TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC ("Transco"), and its authorized agents and contractors, the perpetual right to use the portions of the "Property" (as defined in the Complaint) (the "Property") located within the Permanent Easement for the purposes of laying, constructing, maintaining, operating, repairing, and replacing one 24-inch pipeline ("Pipeline") for the transportation of natural gas, together with any necessary valves, regulators, meters, tie-overs, drips, fittings, equipment for cathodic protection, alternating current (A/C) mitigation, communication and other auxiliary installations (collectively "appurtenances") required for the natural gas pipeline project (the "Project") approved pursuant to the Federal Energy Regulatory Commission ("FERC") Order Issuing Certificate, dated November 21, 2013 (Docket No. CP XX-XX-XXX) (the "Certificate"), the Natural Gas Act and regulations applicable thereto.

Transco shall bury the Pipeline so that it will not interfere with the cultivation of the land, but appurtenances may be installed in whole or in part above ground or below ground.

Upon completion of construction activities relating to the Project, Transco, itself, or through its authorized agents or contractors, will restore the lands within the Permanent Easement as closely as practicable to their condition prior to Transco's use, and restore private and public property, such as fences, gates, driveways, and roads disturbed by Transco's construction work to original or better condition; provided, however, that Transco will not replant any trees, shrubs or crops removed during construction of the Project, except where otherwise required by FERC pursuant to any applicable terms or conditions of the Certificate. Transco will also undertake any additional land restoration measures within the Permanent Easement area as FERC or any federal or state authorities may order or direct to the extent that such measures are required by the terms of the Certificate or any applicable federal or state permits relating to the Project.

Transco shall have all other rights and benefits reasonably necessary for the full enjoyment or use of the Permanent Easement, including the right, from time to time as it may find convenient, to cut or remove any trees, undergrowth and other obstructions of any kind from the Permanent Easement that may injure, endanger or interfere with the construction, operation, maintenance, repair, and/or replacement of the Pipeline or any appurtenances, except as may be indicated to the contrary on any Survey Plat(s) attached to the Complaint, or as otherwise instructed or directed by FERC or any federal or state authorities to the extent required by any terms of the Certificate or any applicable federal or state permits relating to the Project.

Without first obtaining Transco's express approval in writing, no owner of the Property shall: build, construct or place any buildings or permanent structures on the Permanent Easement or any part thereof; change the grade of the Permanent Easement or any part thereof; impound water or otherwise construct or create ponds or lakes on or within the Permanent Easement or any part thereof; plant trees on the Permanent Easement or any part thereof; or otherwise impede or interfere with Transco's use and enjoyment of the Permanent Easement. Nor may any owner of the Property permit others to do any of said acts without first having obtained Transco's express approval in writing. No forbearance by Transco to exercise any rights authorized by the terms of the Permanent Easement for any period of time shall constitute a waiver of such rights or limit Transco's ability to exercise such rights as it may find convenient.

All rights and obligations under this Permanent Easement shall run with the land and be binding upon any and all owners or other persons having an interest in the Property now or in the future.

The Permanent Easement being condemned in this action shall not reduce, limit or alter any rights or obligations under any Transco "Existing Easement Agreement" or "Existing Easement Agreements" as may be identified and described in the Complaint as applicable to the Property.

Exhibit 3

TEMPORARY CONSTRUCTION EASEMENT TERMS

The Temporary Construction Easement (or Temporary Construction Easements) being condemned in this action ("Temporary Construction Easement") shall consist of a temporary, non-exclusive easement giving the Plaintiff, TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC ("Transco"), and its agents and contractors, the right to clear and use the portions of the "Property" (as defined in the Complaint) (the "Property") located within the Temporary Construction Easement as workspace for any and all construction or restoration activities relating to the natural gas pipeline project (the "Project") approved pursuant to the Federal Energy Regulatory Commission ("FERC") Order Issuing Certificate dated November 21, 2013 (Docket No. CP XX-XX-XXX) (the "Certificate"), the Natural Gas Act, and regulations applicable thereto.

Upon completion of construction activities relating to the Project, Transco, itself, or through its authorized agents or contractors, will restore the lands within the Temporary Construction Easement as closely as practicable to their condition prior to Transco's use, and restore private and public property, such as fences, gates, driveways, and roads disturbed by Transco's construction work to original or better condition; provided, however, that Transco will not replant any trees, shrubs or crops removed during construction of the Project, except where otherwise required by FERC pursuant to any applicable terms or conditions of the Certificate. Transco will also undertake any additional land restoration measures within the Temporary Construction Easement as FERC or any federal or state authorities may order or direct, to the extent that such measures are required by the terms of the Certificate or any applicable federal or state permits relating to the Project.

During the term of the Temporary Construction Easement, no owner or owners of the Property shall interfere with, impede, or obstruct any construction or restoration work or activities relating to the Project within the Temporary Construction Easement conducted by Transco or its agents or contractors, or allow others to do so.

So long as it remains in force and effective, the Temporary Construction Easement, and all rights and obligations associated with it, shall run with the land and be binding upon any and all owners or other persons having an interest in the Property now or in the future.

The Temporary Construction Easement, and any and all rights and obligations associated with it, shall terminate and become null and void upon the final completion of Transco's construction and restoration activities relating to the Project.

The Temporary Construction Easement shall not reduce, limit or alter any rights or obligations under any "Existing Easement Agreement" or "Existing Easement Agreements" as may be identified and described in the Complaint as applicable to the Property.

Exhibit 4

TEMPORARY ACCESS ROAD EASEMENT TERMS

The Temporary Access Road Easement (or Temporary Access Road Easements) being condemned in this action ("Temporary Access Road Easement") shall consist of a temporary, non-exclusive easement giving the Plaintiff, TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC ("Transco"), and its authorized agents and contractors, full and free use of the portion of the "Property" (as defined in the Complaint) (the "Property") located within the Temporary Access Road Easement for purposes of ingress and egress of persons, vehicles, equipment, machinery, construction materials and other things to be used in connection with construction work and restoration activities relating to the natural gas pipeline project (the "Project") approved pursuant to the Federal Energy Regulatory Commission ("FERC") Order Issuing Certificate dated November 21, 2013 (Docket No. CP XX-XX-XXX) (the "Certificate"), the Natural Gas Act and regulations applicable thereto. As permitted by the Certificate, Transco and its authorized agents and contractors shall also have the right to widen, add gravel to, and grade the existing roadway within the boundaries of the Temporary Access Road Easement, and to trim any trees that may encroach into the Temporary Access Road Easement area.

Any owner of the Property, or their authorized guests or invitees, shall be permitted to use the lands within Temporary Access Road Easement for purposes not inconsistent with the rights granted to Transco and its authorized agents and contractors pursuant to these terms; provided, however, that no owner of the Property, nor any of their guests or invitees, shall interfere with, impede, or obstruct the use of the Temporary Access Road Easement by Transco or its authorized agents or contractors for the purposes specified in these terms, or allow others to do so.

Upon completion of Transco's construction and restoration work relating to the Project, Transco, or its authorized agents or contractors, shall restore the existing roadway within the Temporary Access Road Easement to as good or better condition than existed prior to its use by Transco or its authorized agents and contractors.

So long as it remains in force and effective, the Temporary Access Road Easement shall run with the land and be binding upon any and all owners or other persons having an interest in the Property now or in the future.

The Temporary Access Road Easement, and any and all rights and obligations associated with it, shall terminate and become null and void upon the final completion of Transco's construction and post-construction restoration activities relating to the Project.

The Temporary Access Road Easement shall not reduce, limit or alter any rights or obligations under any "Existing Easement Agreement" or "Existing Easement Agreements" as may be identified and described in the Complaint as applicable to the Property.